Architecture, Engineering and Construction
Inherited from core
Question- A decision is unknown and blocks progress. May resolve with no agent work at all.
Plus the 29 shared cues in the core vocabulary, which every profile inherits.
Call types specific to this domain
Coordination- Two systems want the same space, or something has to find a path through a space that is already busy. Covers what earlier versions split into clash and routing — in a real room they are the same conversation.
Load- A capacity question — electrical, cooling, ventilation, structural, or water. Spoken as "load", "load study", or "load analysis"; the suffix rule in core section 7.2.1 accepts all three.
Code- An adopted code, jurisdiction, listing, or approval question with a determinate answer — clearance in front of a panel, whether an assembly is listed. Where the answer depends on the project's own constraints and spans many sections at once, that is a Cut sheet call.
Cut sheet- Go study a specific piece of equipment against what this project actually needs, and say whether it works. Deeper than a Code call and specific to the job: the answer wraps many requirements plus the real constraints into one recommendation.
Drawings- What the contract documents actually say — what was drawn, noted, or specified. Usually raised when somebody asserts something is missing.
Constructability- A sequencing, access, or means-and-methods question. How does it get installed, in what order, and can it physically get there.
Value engineering- Is there a cheaper way to accomplish the same thing. A design question with a cost motive, distinct from asking what something costs.
Pricing- What does this cost. A number, not a redesign.
RFI- A formal response is owed to another party.
Submittal- Contractor-provided product data, shop drawings, or samples are under review against the design.
Dialect
None. This profile uses the core phrasing for every cue.
Approval
The design professional in responsible charge who will seal the drawing or calculation the result affects.
The owner still closes the task and states the disposition. Approval is an additional gate on reliance, recorded before the result leaves the room as a finding.
Where a jurisdiction or licensing board designates responsible charge for the work, that person approves and this profile cannot designate anyone else. An agent result is a study input, never a sealed document.
Additional states
sign_offWhere the closed result will be incorporated into a document bearing a professional seal, the professional in responsible charge records approval in the project record, separately from the verbal close in the session.
Worked examples
An owner-architect-contractor meeting. A prospective restaurant tenant intends to install a solid-fuel smoker, and the question is whether the existing kitchen shaft can carry the additional exhaust.
The same kind of coordination meeting, run the way most rooms already run. Nothing here looks like a failure while it is happening — which is the point.
An internal mechanical review. The question has exactly one right owner, so it goes straight to him rather than stopping the room.
Who this is for
Design charrettes, coordination meetings, and owner-architect-contractor sessions where several disciplines study questions against a shared model or drawing set.
These meetings already run on an implicit protocol — an agenda, logs, a round table, polling by name. What they generally lack is a way to close anything in the room. A coordination question gets discussed thoroughly, lands on "it depends," and leaves as a request for information. Under this Standard it leaves as a claimed task with a named owner and a stated disposition.
Call types
| Say | Also | When |
|---|---|---|
| Coordination | Two systems want the same space, or something needs a path through a space that is already busy. | |
| Load | A capacity question — electrical, cooling, ventilation, structural, water. | |
| Code | A code, jurisdiction, listing, or approval question with a determinate answer. | |
| Cut sheet | product, equipment | Go study this specific equipment against what the job actually needs, and say whether it works. |
| Drawings | plans, specifications | What the contract documents actually say — what was drawn, noted, or specified. |
| Constructability | Sequencing, access, means and methods. How does it get installed and can it get there. | |
| Value engineering | Is there a cheaper way to do the same thing. | |
| Pricing | What does this cost. A number, not a redesign. | |
| RFI | A formal response is owed to another party. | |
| Submittal | Contractor product data or shop drawings are under review against the design. |
Say them however you normally would. Core §7.2.1 accepts question, study, and analysis on any of these, so "code question", "load study", and "coordination question" all open the loop — which is how these words came out of the recordings in the first place.
Load is deliberately broad across disciplines rather than reserved for structural loading, because in a coordination meeting the word is used that way in practice.
Code and Cut sheet are different calls, and the line between them is worth stating because it is where a room will hesitate. A Code call has a determinate answer: what is the clearance in front of a panel. A Cut sheet call is the one where the answer depends on this project — can this panel go in that room — and resolving it means pulling many requirements plus the real constraints into a single recommendation.
Coordination absorbed Clash and Routing. Both earlier words described the same conversation, and "clash" carried a suggestion of automated clash detection that was never intended.
Pricing and Value engineering were split out of a single Price call. Asking what something costs and asking for a cheaper way to do it are different questions with different owners, and answering one when the other was asked wastes the exchange.
Ownership
| Task | Owner |
|---|---|
| Clash, Routing | The discipline whose system has to move |
| Load | The engineer responsible for that system |
| Code | Any design professional on the affected discipline |
| Price | Estimator or contractor |
| Build | Contractor |
| RFI | Project manager, with the responsible discipline reviewing |
| Product | The specifying engineer — never a manufacturer's representative |
Approval
This profile requires approval. The Owner closes their own task, as in every domain — but in this one, a closed result cannot be relied upon until the professional in responsible charge has approved it.
Approver: the design professional in responsible charge who will seal the drawing or calculation the result affects.
Where a jurisdiction or licensing board designates responsible charge for the work, that person approves and this profile cannot designate anyone else. That is licensure law, not a rule this Standard invented.
An agent result is a study input. It is never a sealed document, and it does not become one by being approved. Approval under this Standard establishes that a qualified person has reviewed the study and decided what may be relied on. Sealing remains governed entirely by the applicable licensure law.
Additional required state: Sign-off
This profile adds one REQUIRED state after CLOSE:
sign_off— Where the closed result will be incorporated into a document bearing a professional seal, the professional in responsible charge records approval in the project record, separately from the verbal close in the session.
The verbal close ends the loop in the room. The recorded sign-off is what survives into the project file.
Worked examples
Worked examples for this profile are published as data in examples/transcripts/, so the dialogue exists in exactly one place and the repository validator checks that every spoken cue still matches the vocabulary this profile declares.
- Does the kitchen shaft still work? — a real coordination meeting. A prospective restaurant tenant wants a solid-fuel smoker; the task ends Parked with a named blocker rather than Accepted, which is the interesting part.
- Nobody was listening when the constraint was given — the same kind of meeting run the way most rooms already run it. Three invariants break in under a minute, none of them noticeably, and a wrong answer reaches a tenant.
They render at co-prompting.com/examples.
Vocabulary
The shared vocabulary — Ready, Hold, Clarify, Heard, Mine, Prompting now, Adder, Go ahead, Preliminary, Status, Parked, Pass, and the rest — lives in the core specification, Section 7. It is the same in every domain, and several of those cues are MUST-level because they carry an invariant rather than a convention.
Dialect
None. This profile uses the core phrasing for every cue.
Earlier drafts declared two substitutions — "Listening" for acknowledge and "Already running" for already_owned — described as recorded from real coordination meetings. They were checked against the recording in v0.5 and neither phrase appears in it. Both were removed rather than re-justified.
If your coordination rooms genuinely say something else, that is a substitution worth declaring — but declare it from a recording, not from taste. Note that acknowledge is locked (Core §7.3) and cannot be substituted by any profile.
Two worth emphasizing
Out of scope. In a live coordination meeting, a question that falls outside the contracted scope is easy to absorb without comment, and the cost surfaces weeks later. The Standard takes no position on how such work gets authorized. It requires only that the boundary be named while everyone is present.
Preliminary. This is MUST-level, not a courtesy. An unclosed exhaust calculation repeated to a tenant becomes a commitment the moment they act on it.
Notes on vocabulary
Clash is used in its ordinary coordination sense. It does not imply an automated clash-detection run has been performed.
Do not use Change as a call type. It collides with change orders and implies a commercial decision has already been made.
A participant continuing their own agent on an existing task is not making a Call.
Retention
Ten years is set as a floor, on the reasoning that the record should meet or exceed the statute of repose in the project jurisdiction. Confirm the applicable period locally — this is a floor, not legal advice.
The record should carry the project identifier, the discipline, the drawing or specification section affected, and the identity and licence designation of the approving professional.